Saturday, July 26, 2008

CASA 1000 Transmission Line Map


Here our company Afghan Toll was the sub contractor of SNC Lavalin Canada.We were involved with this work from January 2007 while our actual contract period with SNC Lavalin was from 20 April 2008 to 20 June 2008.During this period we completed the entire 650 Km survey from Bandar Sher Khan on Tajikistan border till Torkham on Afghan Pak border.
We worked with SNC Lavalin team led by Mr willy Koituga and Dr Ahsan Akhtar,Dr Greg Weary AND Engineer Shiraz Satchu.
Our report was accepted by SNC Lavalin in August 2008 to their satisfaction.

1 comment:

  1. Hello, My name is Peter Eyre living in England. Can you tell me what happened to the work you were doing in Northern Afghanistan and your proposal that was accepted. Did the project go ahead or did it just remain on paper. I would appreciate a copy of your work if you have it available as I am looking at the agricultural and water aspect in the valleys of the same region. I am interested as to what power is available in the region. King Regards. Peter

    ReplyDelete

Note: Only a member of this blog may post a comment.